Hi all,
I am facing a weird thing. I need Dell PE 1950 but almost all jobs are
scheduled using those machines so it's really hard to get those.
I had one of them provisioned but after creating a new job (I needed 5U3
instead of 5U5) and returning the machine into the spool I was quite
surprised as scheduler immediately used that machine on another
no-machine-specified job w/o checking if someone in the queue needed the
specific machine.
This behaviour is quite dangerous as it can block people from getting
right machine. We had to (thanks mganisin) cancel the job two times to
get machine to me again.
bug created:
https://bugzilla.redhat.com/show_bug.cgi?id=635611
thanks,
Vld