I would suggest that we create a clear SOP for fall back planning in case
a feature, especially a crit path feature, is not ready for prime time.
Obviously, if a feature is not %100 by feature freeze, then it needs to be
dropped.  I would even venture to suggest that we include in the SOP
something along the lines of "If feature is not 80% by point X (X being two
weeks prior to freeze), then FESCo should at that point evaluate enacting
the fall back."

John.