Updates Criteria Summary/Brainstorming
Kevin Kofler
kevin.kofler at chello.at
Sun Nov 21 21:49:25 UTC 2010
Toshio Kuratomi wrote:
> packages. Perhaps this could be longer than for non-critpath. The big
> issue that people have observed with depending on timeouts, though, is
> that pushing new updates in the meantime resets the time that a package
> needs to wait to get to stable. Could bodhi be changed to let multiple
> packages be in the testing repository at one time and only obsolete them
> when a newer package enters the stable repo? That would allow longer
> timeout periods to make more sense.
The problem with that is that only one of the updates is going to be
actually tested at a time.
Kevin Kofler
More information about the devel