On Wed, Jul 29, 2015 at 07:31:15AM -0600, Stephen John Smoogen wrote:
> In doing something like this we would need to know what the impact is.
> What parts of production of an Alpha would be down during the upgrade?
> I think there things releng has in pagure but I don't know if those
> would make any release parts impossible if it was down for 2-3 hours.

That is also something I don't know, git access will remain available (via ssh
always, via http most of the time (except when I restart apache)).
The update only influences the web-UI part, not gitolite in anyway.

Not knowing how rel-eng relies on pagure I can't estimate the impact.
I can however estimate the down-time to be very short (in the order of the 10s
of minutes), it's updating the package, calling alembic to upgrade the database
and restart apache.


Pierre

> If there are no impacts on production then it isn't covered by a freeze.
> If there are few impacts on production then a freeze break request can
> be granted.
> If there are many impacts on production then FBR probably won't be
> granted unless not doing so makes things worse.
> 
> On 29 July 2015 at 05:06, Pierre-Yves Chibon <pingou at pingoured.fr> wrote:
> > Hi everyone,
> >
> > I was planning on making a new release of pagure today, not realizing that we
> > were entering freeze.
> >
> > I would like to hear more opinions about pushing this release, here is the
> > current changelog:
> > - Include the tags in the JSON representation of a project
> > - Add the ability to open a pull-request from a git repo not hosted on pagure
> > - Fix pagination when browsing the list of commits
> > - Fix the fork button when viewing the Settings of a project
> > - Adjust the example apache configuration file
> > - Add a favicon with pagure's logo
> > - Fix asynchronous commentting on pull-requests
> > - Start working on some documentation on how to install pagure
> > - Do no flash messages when a comment is submitted via javascript (ie: async)
> > - Do not blink the tittle of the page if the page is already on focus
> > - Retrieve ssh key from FAS and set it up in pagure if none is currently set-up
> >
> > The remote PR needs a small DB change, everything else is pretty much bug fixes
> > or minor improvements.
> >
> > Thoughts?
> >
> > Thanks,
> > Pierre
> >
> > _______________________________________________
> > infrastructure mailing list
> > infrastructure at lists.fedoraproject.org
> > https://admin.fedoraproject.org/mailman/listinfo/infrastructure
> 
> 
> 
> -- 
> Stephen J Smoogen.
> _______________________________________________
> infrastructure mailing list
> infrastructure at lists.fedoraproject.org
> https://admin.fedoraproject.org/mailman/listinfo/infrastructure


More information about the infrastructure mailing list