This outage has been cancelled for the time being. A new ticket and
announcement will be created when it has been rescheduled.
On 7 May 2018 at 13:02, Stephen John Smoogen <smooge(a)gmail.com> wrote:
Planned Outage - Server updates - 2018-05-09 12:00 UTC
There will be an outage starting at 2018-05-09 12:00 UTC,
which will last approximately 4 hours.
To convert UTC to your local time, take a look at
http://fedoraproject.org/wiki/Infrastructure/UTCHowto
or run:
date -d '2018-05-09 12:00UTC'
Reason for outage:
Ibiblio is moving systems to a newer rack with 10G SFP+ networks.
Systems will need to be powered down, moved over to the new racks,
powered back up, configured to use the new networks in failover mode.
Affected Services:
download-ib01.fedoraproject.org
pagure-proxy01.fedoraproject.org
proxy04.fedoraproject.org
noc02.fedoraproject.org
unbound-ib01.fedoraproject.org
ns02.fedoraproject.org
people02.fedoraproject.org
proxy12.fedoraproject.org
smtp-mm-ib01.fedoraproject.org
torrent02.fedoraproject.org
Torrent and people will be down during that time. Systems configured
to use download-ib02 will also be.
Ticket Link:
https://pagure.io/fedora-infrastructure/issue/6915
Please join #fedora-admin or #fedora-noc on
irc.freenode.net
or add comments to the ticket for this outage above.
--
Stephen J Smoogen.